Description

Client IDA Ireland

Service Type Civil Engineering

Date Sep-14

Summary

This project entailed upgrade works to the existing lighting system, foul water repair works, hydrant and sluice valve repairs and road remediation works.The road works were divided into two different remediation works (Reconstruction and Resurfacing) which are to be carried out to NRA specification as per instruction in tender drawings. The Resurfacing of the road shall involvde the planing of existing carraigeway and overlaying with a new asphalt concrete binder and surface course. Road reconstruction will require the removal and disposal of existing carraigeway and reconstruction of a new road structure including sub base, asphalt concrete binder and surface course. CCTV footage of existing foul sewer system after completion of the works.

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close